BlueSky Resources

Mainhead b: proposed 500kv double circuit transmission line from PMU Bentong south to PMU Lenggeng (point L to point LGNG) and proposed 275kV double circuit transmission line from PMU Lenggeng to PMU Mahkota Cheras (point L to LGNG) – slope rehabilitation work for AP64 (275kV).